Motor energy surveys, IE4 PMSM motor conversion, motor modernisation and verification of savings.

Motor energy survey

We measure first

Decisions based on measured data, not estimates

We record your motor at its panel during normal production. Idle, part-load and full-load periods, active and reactive power are captured second by second.

From this recording we calculate the motor's real losses, how much a PMSM would save and how quickly the investment would pay back, motor by motor.

Panel and power analyser during a measurement
100%measured on site, in production
Measurement equipment

The measurement behind the savings figure

3-phase power analyser

Chauvin Arnoux power and energy analyser recording current, voltage, active / reactive / apparent power, power factor and harmonics (THD).

Rogowski current probes

Flexible coils wrap around the supply cable. No cable is disconnected and the machine keeps running.

Second-by-second logging

One sample per second, covering at least one full working cycle of the machine: from one hour to several days.

Operating states

The recording is split into idle, part-load and full-load states, each with its own duration and power.

Standards-based loss model

Motor losses are split into load-independent and load-dependent parts following IEC 60034-2-1; drive losses are included on the PMSM side.

Verification after conversion

The same measurement is repeated after the conversion and savings are reported in kWh, cost and CO₂.

We measure, predict and report the saving rate

Measurement data alone is not a result. We process every recording in our in-house analysis software and state the saving rate before any conversion.

1Measure

We record the motor at its panel, second by second, during production.

2Predict

Our software simulates the same duty profile with a PMSM and drive and calculates the new power for each operating state.

3Report

We report annual kWh, cost and CO₂ savings, the saving rate and the payback period.

Our in-house analysis software

  • Reads analyser recordings directly and processes thousands of seconds of data in minutes.
  • Automatically separates idle, part-load and full-load periods and shows the energy share of each.
  • Calculates losses following IEC 60034-2-1.
  • Quantifies the effect of reducing speed while idling, showing where the saving comes from.
  • The same method is used in every project, so results are comparable and repeatable.

Why it matters: estimate-based calculations either overstate savings or miss the opportunity. A prediction built on measured data lets you decide on the investment with numbers, and the result is verified by the same measurement after conversion.

IE4 PMSM motors

PMSM motor conversion

We replace induction motors with IE4 permanent magnet synchronous motors (PMSM) and a matching drive. The motor is sized to the measured peak torque, not oversized.

  • Power and speed selection based on measurement (1000 / 1500 / 3000 rpm)
  • Mechanical fit, coupling, installation and commissioning
  • Speed reduction while idling for additional savings
  • Verification measurement after conversion

Motors, drives and automation products

We supply the motors, drives, switchgear and automation products used in our conversion projects.

  • IE4 PMSM motors
  • Cumark ES series drives
  • Schneider Electric and Telemecanique products
  • Catalogues and manuals available for download
Products and catalogues →
Construction and performance

PMSM and induction motor side by side

Both motors have a similar stator; the difference is the rotor. A PMSM rotor carries permanent magnets, an induction motor rotor has squirrel-cage bars. With no rotor current, a PMSM has no rotor losses.

Internal construction of a PMSM and an induction motor: stator, rotor, bearing, frame and terminal box

Power factor (cosφ)

00.250.500.751.00
0.70Induction motor
0.95PMSM + drive

Energy consumption

Induction motor
20–40%less energyPMSM + drive

Values are averages of our measurements before and after conversion. Results vary from plant to plant; the most reliable way is to start by measuring your existing motor. In our measured billet shear project: 25.8% less energy, cosφ 0.49 → 0.95 →

Free initial assessment for your motors

Tell us about your largest or longest-running motors and we will estimate the savings potential.

Request a call →
WhatsApp